Wind turbine towers
Juwi Wind GmbH manufactures wind turbine towers according to the Advanced Tower Systems construction system. The first 90 metres of the shaft are made up of four slim concrete corner elements with tapered, level concrete slabs in-between. All elements are 15 metres high, making it possible for them to be transported in a normal way, thereby shortening construction times.
We supplied a steel mould for the corner elements of an adjustable tilting table to pour the increasingly smaller, tapered level elements. As the elements are joined when cold, accuracy of the formwork was a strict requirement.