Pre-stressed floor slabs
For the manufacturing of floor slabs and hollow-core floor slabs we supply complete long beds to the concrete industry. We regularly make innovative improvements, such as contact heating, making it possible to considerably shorten hardening times, saving you energy in the process. Another improvement is the pneumatically operated side edge, as a result of which fewer man hours are needed to open and close the moulds.
Over the years, we have supplied many hundreds of metres of slab lengths. Our moulds meet the vital requirement that the formwork floor has to be 100% level for high-quality walls or floors. Our lengths easily meet the CUR 100 B2 flatness requirement.