Cut & Cover tunnels
Our steel formwork for Cut & Cover tunnels such as the Noord-Zuidlijn Amsterdam, Spoortunnel in Delft, Drontermeertunnel, Statenlijn Rotterdam and Avenue2 Maastricht allows for incredible time savings. One of the reasons for this is the fact that facilities such as fire-resistant materials like Promatect, can be poured simultaneously. Our formwork is suitable for concrete surfaces A, B1 and B2 under CUR 100 without visible formwork joints. As this concerns customised formwork, virtually anything is possible: self-driving, hydraulic adjustment, no centring by the walls, cooling or heating systems in the wall panels. They are practically always deployed in a weekly cycle. Our formwork is fitted with highly solid safety provisions such as wide stairs and steel catwalks.